TM 5-2010-205-14
17. Install elbow (4).
18. Install coupling (5).
19. Install tee (7).
20. Install elbow (9).
21. Install elbow (10).
22. Install pipe (11).
23. Install elbow (15).
24. Install reducer (16).
25. Install pipe spool (17).
26. Install heat exchanger (14).
27. Install U-bolts (3).
28. Install and tighten bolts (13).
29. Install hose (12).
30. Install hose (8).
31. Install hose (6).
32. Install hose (2).
33. Install hose (1).
4-94