Tweet |
Custom Search
|
|
|
||
TM 5-2010-205-14
Figure 5-4. Cooler Assembly
5.
Remove plug (11), spring (10) and bypass valve (9) from base.
6.
Remove O-ring seal (12) from plug (11).
7.
Install new O-ring seal on plug (11).
8.
Install bypass valve (9), spring (10) and plug (11) in base.
9.
Install bypass valve (8), spring (7) and cap (6) assembly in base.
10. Tighten cap (6) to a torque of 15 (+/1) 4 lb-ft.
11. Install core (3) in base.
12. Install gasket (4) on base with the index pointing toward the front of the engine and in the up position.
13. Install gasket (5) on cover (2).
14. Install cover (2) on base.
15. Tighten bolts (2).
5-11
|
||