Custom Search
 
  
 
TM 55-1905-219-14-1
Table 2-1. PREVENTIVE MAINTENANCE CHECKS AND SERVICES (PMCS) - continued
Location
Item
Item to Check/
Not Mission
No.
Interval
Service
Procedure
Capable :
162
LARGE CYLINDER
Continued
WARNING
Before
performing
maintenance, make sure that
the system is turned off and
that locking pin (9) is inserted
in pneumatic control head
(10).  The instruction should
be
read
before
any
maintenance is performed on
the cylinder assembly.
Insert locking pin (9). Disconnect pneumatic
control head (10) and tube assembly (11).
Then remove screws (12), washers (13),
bracket (14) and nuts (15) from cylinder (16).
Weigh the cylinder and valve assembly.
Filled, the assembly should weigh 213 Ibs.
(97 kg). Replace if below weight.
Replace cylinder (16), nuts (15), bracket
(14), washers (13), and screws (12).
Reconnect tube assembly (11) and
pneumatic control head (10). Remove
locking pin (9). Turn the system on.
2-206 Change 4


 


Privacy Statement - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business