Custom Search
 
  
 
TM 55-1905-219-14-10
5-7. VARIABLE SPEED MECHANICAL GOVERNOR-MAINTENANCE INSTRUCTIONS (Continued).
LOCATION
ITEM
ACTION
REMARKS
OVERHAUL-DISASSEMBLY (Cont)
o. Needle
1. Support the control
link operating lever
(88)
on a sleeve.
2. Rest the sleeve on
the bed of an arbor
press.
3. Press both bearings
out of the lever.
p. Buffer
Remove.
If necessary.
screw (89)
and lock
nut (90)
q. Dowel pins
Remove.
If necessary.
(91) and
pins (92,
93, 94
and 95)
5-192


 


Privacy Statement - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business