Custom Search
 
  
 
TM 55-1905-219-14-10
5-29. MAIN SWITCHBOARD - MAINTENANCE INSTRUCTIONS (Continued).
LOCATION
ITEM
ACTION
REMARKS
REPAIR
NOTE
All wiring is numbered, refer to schematic (FO-2) for location.
1. Gages
1. Disconnect wiring.
(1 and 3)
2. Remove nuts and
lockwashers.
3. Replace meter.
4. Install lockwashers
and nuts.
5. Reconnect wiring.
1. Disconnect wiring.
(2 and 4)
2. Remove nuts and
lockwashers.
3. Replace meter.
4. Install lockwashers
and nuts.
5. Reconnect wiring.
c.
1. Disconnect wiring.
(5 and 7)
2. Remove nuts and
lockwashers.
3. Replace meter.
4. Install lockwashers
and nuts.
5. Reconnect wiring.
1. Disconnect wiring.
scope (9)
2. Remove nuts and
lockwashers.
5-442


 


Privacy Statement - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business