Custom Search
 
  
 
TM 55-1905-219-14-10
5-48. BOW RAMP, SHEAVES, AND FAIRLEADS-MAINTENANCE INSTRUCTIONS (Continued).
LOCATION
ITEM
ACTION
REMARKS
REPLACE (Cont.)
3. Remove chain (8)
from ramp.
d. Turnbuckle
1. Remove cotter pin
Secure chain to
(9), and pins (10).
prevent movement.
2. Remove turnbuckle
(11).
e. Swivel
1. Attach keeper to
Prevent cable
cable.
from running
through upper
fairlead sheave.
2. Remove cotter pin
(12), and pin (13).
3. Remove swivel (14).
f.
Chain
1. Remove chain (8).
Use crane if
necessary.
2. Remove chain link
(15).
3. Replace chain (8),
Secure chain to
and chain link
prevent move-
(15).
ment.
g. Swivel
1. Attach swivel (14),
using pin (13),
and cotter pin (12).
2. Remove keeper on
cable.
h. Turnbuckle
1. Install turnbuckle
(11).
2. Install pins (10),
and cotter pins (9).
i.
Chain end
1. Install pin (7) in
link
chain and ramp.
5-646


 


Privacy Statement - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business