TM 55-1905-219-14-10
5-48. BOW RAMP, SHEAVES, AND FAIRLEADS-MAINTENANCE INSTRUCTIONS (Continued).
LOCATION
ITEM
ACTION
REMARKS
REPLACE (Cont.)
3. Upper
a.
Bow ramp
Lower.
Fairlead
Sheave
b. Swivel
1. Disconnect from
(14)
turnbuckle (11}.
2. Let cable go slack.
c.
Cotter pin
Remove.
(23)
d. Nut (24)
Remove.
e. Sheave pin
Remove.
(25), brass
washers
(26), and
sheave
(27)
f.
Lubrication
Replace.
If necessary.
fitting
(28)
g. Sheave pin
install.
(25) , brass
washers
(26), and
sheave
(27)
h. Nut (24),
Install.
and cotter
pin (23)
i.
Swivel
Attach to turnbuckle.
(14)
j.
Lubrication
Grease,
fitting
(28)
4. Lower
a. Bow Ramp
Lower.
Fairlead
Sheave
b. Swivel
1. Disconnect from
(14)
turnbuckle (11).
5-650
|
|