Custom Search
 
  
 
TM 55-1905-219-14-10
5-48. BOW RAMP, SHEAVES, AND FAIRLEADS-MAINTENANCE INSTRUCTIONS (Continued).
LOCATION
ITEM
ACTION
REMARKS
REPLACE (Cont.)
b. Cable
Disconnect from winch drum.
c.
Swivel
Disconnect.
(14)
d. Cable
1. Pull from upper fair-
lead sheave.
2. Replace.
e. Swivel
Reconnect.
(14)
f.
Cable
Reconnect to winch drum.
g. Turnbuckle
Readjust.
(11)
8. Ramp
a. Ramp
1. Lower.
Let chain go
slack.
2. Install crane.
b. Chain end
Disconnect.
See step 1c.
link
c.
Hinge pins
Remove from 10 places.
See step 6.
d. Ramp
Replace.
e. Hinge pins
Install.
See step 6.
f.
Chain end
Install.
See step 1i.
link
g. Ramp
1. Remove crane.
2. Operate and adjust-
turnbuckles (11).
5-656


 


Privacy Statement - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business