Custom Search
 
  
 
TM 55-1905-219-14-11
6-1. PROPELLER SHAFT AND BEARINGS - MAINTENANCE INSTRUCTIONS
(Continued)
LOCATION
ITEM
ACTION
REMARKS
REMOVAL (Cont)
a. Shaft
1. Remove lockwire (28),
Tube
seal
and bolts (29).
Shaft
(27)
2. Slack off qlands (30).
b.
Cotter
Remove.
pins (31)
nuts (32),
and bolts
(33)
c
Tube shaft
Force aft approximately
(34)
6 inches (15 cm).
d. Cotter
Remove.
pin (35),
and nut
(36)
e. Female
Remove.
tube shaft
half coup-
ling (37)
and shaft
keys (38)
6-12


 


Privacy Statement - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business