Custom Search
 
  
 
TM 55-1905-219-14-2
2-65. MAIN MAST - RAISING.
To raise the main mast proceed as follows after the preliminary procedures have been completed.
Do not attempt to raise main mast before energizing the central hydraulic system.
Check hydraulic system, make sure it is not in operation and no other work is
being performed anywhere on the system.
a.
Engine Access Room.
Press the START switch (1) on the centralized hydraulic remote control.
b. Port Side of Deckhouse Aft of Pilot House.
(1) Remove stanchions life lines as required.
Safety devices are removed, so that the yardarm can be rotated, and mast raised.
2-359


 


Privacy Statement - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business