Tweet |
Custom Search
|
|
|
||
TM 55-1905-219-14-2
2-103. OVERBOARD DISCHARGE - HOLDING TANK (Cont).
(b)
If sewage discharge pump #2 is to be used, proceed as follows:
1
Place ball valve (2, Figure FO-55) lever in the closed position.
2
Place ball valve (3, Figure FO-55) lever in the open position.
3
Place disconnect. switch (6) in the ON position.
4
Press the START switch (7) on the controller.
2-457
|
||