Custom Search
 
  
 
TM 55-1905-219-14-4
3-9.3.
EMERGENCY SHUTDOWN HEAD & LINKAGE - MAINTENANCE INSTRUCTIONS
(Cont).
LOCATION
ITEM
ACTION
REMARKS
INSTALLATION
Control cables are precision equipment an should be handled with care.  They should not be bent
d
sharply, twisted, or forced into position. They should be allowed to adjust themselves to a given installation and
worked into position rather than forced.
UNPACKING INSTRUCTIONS
The control cable is shipped in a figure 8 shape with sufficient number of layers to take care of its length.
The whole package should be lifted out and laid on a smooth open surface. Cut the restraining ropes and -
holding the top end - walk away from the package until the cable is straightened out. The cable should unfold
smoothly and evenly. However, if a kink or loop develops, stop and uncoil this section. When the control is out
straight, lift one end up about 4 feet and walk along handing the cable through your hands, keeping it about 4
feet off the deck, until the other end is reached. This removes internal twists and gives the cable full flexibility.
INSTALLATION INSTRUCTIONS
Never force cable into any position. Let it take its natural shape by shaking ti gently before and during
operation. Be sure not to bend flexible parts of cable where it joins the rigid end fitting. Allow an inch or more
to remain straight before starting bend. When installing articulator fittings,DO NOT twist end rod.
CABLE LENGTHS
Port Engine
24 feet
(7.3 meters)
Starboard Engine
16 feet
(4.9 meters)
5.
Emergency
a.
Locking
Assemble.
shutdown
pin (24),
cable and
spring
linkage
(23),
lock pin
bushing
(25),
knob
(22), and
roll pin
(21)
3-392


 


Privacy Statement - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business