Custom Search
 
  
 
TM 55-1905-219-14-4
3-40.3.
CONNECTING ROD BEARINGS - MAINTENANCE INSTRUCTIONS (Cont).
LOCATION
ITEM
ACTION
REMARKS
INSTALLATION (Cont)
d. Bearing
Assemble.
Note the number
cap(2)
and letter
and lower
stamped on the
bearing
connecting rod
shell (5)
and the bearing
cap and install
the lower bear-
ing shell-the
one with the
continuous oil
groove-in the
bearing cap,
with the tang
on the bearing
shell in the
groove in the
bearing cap.
e. Bearing
Install.
Torque to 60-70
cap (and
lb-ft (81-95
lower
Nm) torque
bearing
(lubrite nut)
shell
or 65-75 lb-ft
assembly)
(88-102 Nm)
(2), and
torque (castel-
nuts (1)
lated nut).
f. Lube oil
Install.
Refer to para-
pump
g. Oil in-
Install.
Refer to para-
let pipe
3-39.
h. Oil pan
Install.
Refer to para-
i.
3-35.
i. Engine
Fill.
oil
3-865


 


Privacy Statement - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business