Custom Search
 
  
 
TM 55-1905-219-14-5
3-106. HYDROSTARTER PIPING (AFT ENGINE ROOM) - MAINTENANCE INSTRUCTIONS (Cont)
LOCATION
ITEM
ACTION
REMARK
INSPECTION (Cont)
b. Check fittings and
connections for
tightness and leaks.
6.
Hand pump
Check for leaks.
Refer to para-
(6)
maintenance.
7.
a. Check for leaks.
valve (7)
b. Check fittings. Make
sure they are tight.
8.
Filter and
a. Check for leaks.
gasket (8)
b. Check for cracks,
dents and wear.
9.
Valve ball
a. Check for leaks.
3000 lbs.
(9)
b. Check for cracks,
dents and wear.
c. Check fittings for
tightness.
REPLACE
The oil pressure in this system must be released prior to servicing the solenoid
valve or any other components of the system to prevent possible injury to
personnel or equipment.
NOTE
Release the pressure in the hydrostarter system by opening relief valve on side
of the pump approximately 1/2 turn.
3-1806


 


Privacy Statement - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business