Custom Search
 
  
 
TM 55-1905-219-14-5
3-110.2. BREAKGLASS CONTROL STATION - MAINTENANCE INSTRUCTIONS.
This task covers:
a. Inspection
b. Repair
INITIAL SETUP
Test Equipment
Reference
NONE
NONE
Equipment
Special Tools
Condition
Condition Description
Para
NONE
NONE
Material/Parts
Special Environmental Conditions
NONE
NONE
Personnel Required
General Safety Instructions
1
Observe all WARNINGS.
LOCATION
ITEM
ACTION
REMARKS
WARNING
Make sure the source of electrical power is shut off. Tag all switches and circuit
breakers. Failure to do this could result in serious injury or loss of life, and major
damage to the landing craft.
INSPECTION
1. Control
a. Check exterior wires
If defects are
station
and cables for signs
found, refer to
of fraying or deter-
Direct Support
ioration.
Maintenance.
b. Check that hardware
is not damaged.
c. Check that glass is
not damaged.
3-1845


 


Privacy Statement - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business