Tweet |
Custom Search
|
|
|
||
TM 55-1905-219-14-5
SECTION II. MAINTENANCE ALLOCATION CHART (CONTINUED)
(1)
(2)
(3)
(4)
(5)
(6)
GROUP
COMPONENT/
MAINTENANCE
MAINTENANCE LEVEL
TOOLS AND
NUMBER
ASSEMBLY
FUNCTION
C
O
F
H
D
EQUIPMENT
REMARKS
02
Electric Power
Generation and
Distribution
Switchboard (main)
Inspect
.4
Replace
24.0
Repair
.5
25.5
Inspect
.5
Service
1.0
Replace
6.6
Power Distribution
Panel Boards
Inspect
.5
Repair
2.0
Replace
3.5
Overhaul
6.0
Generator 12V
Inspect
.3
Service
1.0
Test
1.0
Replace
1.0
Repair
5.0
Generator (40 KW)
Inspect
.2
Replace
16.0
Service
2.0
Overhaul
40.0
Engine Assy
Inspect
.3
Service
1.5
Replace
40.0
Repair
8.5
Overhaul
40.0
Test
8.0
Engine Controls
Inspect
.5
Adjust
2.0
Replace
8.0
Repair
2.0
Emergency Stop
Inspect
.5
Adjust
.5
Replace
1.0
Repair
1.0
Alarm Switches
Inspect
.3
Adjust
.2
Replace
.5
Repair
.5
B-4
|
||