Custom Search
 
  
 
TM 55-1905-219-14-6
3-141.2. ENGINE THROTTLE LINKAGE - MAINTENANCE INSTRUCTIONS.
LOCATION
ITEM
ACTION
REMARKS
INSPECTION
1.
Control
Inhaul/
1. Place in inhaul and
Check for ease
station
payout
payout positions.
of operation,
clutch/
broken, frayed
throttle
2. Place in idle and
coverings and
full speed positions.
damaged control
cables or con-
trol unit.
TEST AND ADJUSTMENT
NOTE
Refer to paragraph 3-141.1 for test and adjustment procedures.
REMOVAL - CONTROL UNIT
2.
Connecting
a.
Nut (2)
Remove.
rod
assembly
(1)
b.
Ball
Remove from engine control
joint
lever (4).
(3)
3.
Articu-
a.
Nut
Remove.
lator
(6),
assembly
and
(5)
lock-
washer
(7)
b.
Ball
Remove from control
joint
lever (9).
(8)
4.
Control
Bolts
Remove.
Refer to para-
unit
and
lock-
washers
3-2402


 


Privacy Statement - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business