Custom Search
 
  
 
TM 55-1905-219-14-7
SECTION VI. STORAGE PREPARATION AND REACTIVATION
3-220. GENERAL.
When a component, such as an engine, is to be stored or removed from operation for a period of time, special
precautions should be taken to protect the component. The interior and exterior of the component should be protected
from rust accumulation and corrosion.
It will be necessary to remove all rust or corrosion from any exposed part before applying a rust preventive
compound. Therefore, it is recommended that the component be processed for storage as soon as possible after removal
from operation.
The components should be kept as dry as possible during storage. Heat equipment in the winter months and
dehumidify equipment in the summer.
3-221. ADMINISTRATIVE STORAGE.
To place a component in administrative storage (1 to 45 days) proceed as follows:
1. Perform the next scheduled preventive maintenance checks and services (PMCS).
2. Correct all known deficiencies.
3. Clean the exterior of all components with fuel oil (except electrical wiring) and dry with compressed air.
4. Seal all openings with barrier material. The material used must be waterproof, vaporproof, and possess
sufficient physical strength to resist puncture and damage from the expansion of entrapped air. Use metal or
wood covers where practical.
5. In freezing weather, drain all water from the components.
6. Cover with a clear plastic cover.
3-3354


 


Privacy Statement - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business