Custom Search
 
  
 
TM 55-1905-219-14-8
4-7.6. POWER HEAD AND RECEIVER ASSEMBLY - MAINTENANCE INSTRUCTIONS
(Continued).
LOCATION
ITEM
ACTION
REMARKS
INSTALLATION
10. Power
a. Crank-
Install.
Refer to paragraph
shaft and
head
connect-
ing rod
and
piston
assem-
blies
b. Crank-
Install
1. When installing new
case
seal strips to the
(19)
crankcase, note that
seals-
they are longer than
port (20)
necessary and must
and star-
be trimmed on in-
board
stallation. To in-
(21)
stall seal strips,
remove all traces
of cement on crank-
case faces and
grooves. Apply hard
drying cement at
several points
along the grooves
and particularly
at the end of each
groove. Place the
seal strip into
position immediate-
ly, before the
sealer dries,
allowing each end
to overhang slight-
ly. Then, before
the sealer sets,
guide the entire
length of the strip
towards the outside
edge of the groove.
Use the thumbs of
each hand to accom-
plish this as illus-
trated.
4-192


 


Privacy Statement - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business