Tweet |
Custom Search
|
|
|
||
TM 55-1905-219-14-8
4-10.2. LUBE OIL PUMP - MAINTENANCE INSTRUCTIONS (Continued).
LOCATION
ITEM
ACTION
REMARKS
INSTALLATION
5. Stuffing
Retaining ring
Reassemble carefully.
Replace gasket.
box
(26),seal col-
lar (25),
mechanical seal
(24), gasket
(23), gland
(22), and
screws (21)
6. Pump body
a. Gasket (20),
Reassemble.
Replace gasket
bearings
and bearings if
(19), and
necessary.
mounting
bracket
(27)
NOTE
Apply an molybdenum disulfide-based lubricant to gears
(13 and 14), side plate (7) and mounting bracket (27).
b. Driving
Reassemble.
shaft (18),
key (17),
and driving
gear (14)
c. Driven
Reassemble.
shaft (16),
key (15),
and driven
gear (13)
d. Pins (12),
Reassemble.
Replace gasket.
pump body
(11), and
gasket (10)
e. Bearings
Reassemble.
Replace bearing
(9), pins
if necessary.
(8), side
plate (7),
and screws
(6)
4-522
|
||