Custom Search
 
  
 
TM 55-1905-219-14-8
4-20. URINAL - MAINTENANCE INSTRUCTIONS (Continued).
LOCATION
ITEM
ACTION
REMARKS
INSTALLATION
9. Urinal
a. Two white
Assemble to bulkhead.
neoprene
strips (11),
urinal (10),
four cushion
sleeves (7),
brass flat-
washers (8),
and screws
(9)
b. Neoprene
Install and tighten.
flatwashers
(6), and
retaining
nuts (5)
c. Hose (4),
Install and tighten
and hose
hose clamps.
clamps (3)
d. Hose (2),
Install and tighten
and hose
hose clamps.
clamps (1)
10. Flow
a. Piping
Reconnect.
switch
b. Wiring
Reconnect, remove tags.
c. Flush water
Turn on valve.
4-736


 


Privacy Statement - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business