Custom Search
 
  
 
TM 55-1905-219-14-8
4-33. GAGE BOARD - AIR CONDITIONING - MAINTENANCE INSTRUCTIONS
(Continued).
This task covers:
a.
Inspection
c.
Repair
b.
Removal
d.
Adjustment
INITIAL SETUP
Test Equipment
References
Paragraph
NONE
4-28r
Leak Detection
4-35.6
Tubing Maintenance
Equipment
Special Tools
Condition Condition Description
NONE
NONE
Material/Parts
Special Environmental Conditions
NONE
NONE
Personnel Required
General Safety Instructions
1
Observe safety precautions in
LOCATION
ITEM
ACTION
REMARKS
INSPECTION
1. High, low
a. Wiring
Inspect for breaks,
and water
cracks, and worn insula-
pressure
tion.
switch
b. Switch
Inspect for breaks,
cracks and signs of dam-
age.
c. Tubing
Inspect for bends,
breaks, and cracks.
2. Gages
a Tubing
Inspect for bends,
breaks and cracks.
4-933


 


Privacy Statement - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business