Tweet |
Custom Search
|
|
|
||
TM 55-1905-219-14-9
4-53.1. FIRE, BILGE, AND BALLAST - PIPING SYSTEM - MAINTENANCE
INSTRUCTIONS (Continued).
LOCATION
ITEM
ACTION
REMARKS
REPAIR (Cont.)
h. Reach rod
Replace.
(26A)
14. Sea chest
vent
NOTE
All piping at this level of maintenance is 1/2 inch copper-nickel
with solder joints. Use existing procedures for soldering.
a. Tubing (27)
Replace.
If necessary.
b. Elbow (28)
Replace.
If necessary.
15. Electric
a. Stop cock
Replace.
If necessary.
Bilge
(29)-
pump
b. Simplex
Replace.
a. If. necessary.
strainer
(30)
b. Refer to
for mainte-
nance.
16. Hose con-
a. Chain and
Replace.
If
necessary.
Nections
cap (31)
b. Chain and
Replace.
If
necessary.
cap (32),
and nipple
(33)
17. Engine
a. Cable clamps
Remove.
Driven
(34)
bilge
pump
b. Hose (35)
Replace
Hose is 3-1/2
inch-.
or
c.
Hose (36)
Replace
Hose is 2-7/8
inch.
Change 1
4-1247
|
||