TM 55-1905-219-14-9
4-53.4. WYE STRAINER - MAINTENANCE INSTRUCTIONS (Cont).
This task covers:
a. Inspection
b. Service
INITIAL SETUP:
Test Equipment
References
Paragraph
NONE
Gage Piping
Equipment
Special Tools
Condition
Condition Description
NONE
NONE
Material/Parts
Special Environmental Conditions
NONE
NONE
Personnel Required
General Safety Instructions
1
NONE
LOCATION
ITEM
ACTION
REMARKS
INSPECTION
1. Wye
a. Body
Inspect for breaks,
strainer
cracks and leaks.
SERVICE
2.
a. Pipe plug
Remove.
Drain.
(1)
b. Cover (2)
Remove.
Discard gasket.
and gasket
(3)
c.
Screen
1. Remove.
basket (4)
2. Clean.
3. Replace.
4-1268