Tweet |
Custom Search
|
|
|
||
TM 55-1905-219-14-9
4-59.1. WASHDOWN COUNTERMEASURE SYSTEM - MAINTENANCE INSTRUCTIONS.
This task covers:
a. Inspection
b. Replace
INITIAL SETUP:
Test Equipment
References
NONE
NONE
Equipment
Special Tools
Condition Condition Description
Pipe soldering
NONE
Material/Parts
Special Environmental Conditions
NONE
NONE
Personnel Required
General Safety Instructions
1
NONE
LOCATION
ITEM
ACTION
REMARKS
INSPECTION
1. Washdown
a. Nozzles
Inspect for damage.
system
b. Gate valve
Inspect for proper
operation.
c.
Butterfly
Inspect for proper
valve
operation.
d. Piping
Inspect for bends,
breaks, cracks, and
leaks.
REPLACE
2.
a. Nozzles P1/2
Replace.
If necessary.
inch (1)
Change 1
4-1308
|
||