Custom Search
 
  
 
TM 55-1905-219-14-9
4-59.1. WASHDOWN COUNTERMEASURE SYSTEM - MAINTENANCE INSTRUCTIONS
(Continued).
LOCATION
ITEM
ACTION
REMARKS
REPLACE (Cont)
z.
Copper
Replace.
If necessary.
tubing 1
inch ID (26)
aa. Copper
Replace.
If necessary.
tubing 1-1/4
inch ID (27)
ab. Copper
Replace.
If necessary.
tubing 1-1/2
inch ID (28)
ac. Elbows (29)
Replace.
If necessary.
ad. Butterfly
Replace.
If necessary.
valve (30)
ae. Nuts (31)
Replace.
If necessary.
af. Screws (32)
Replace.
If necessary.
ag. Screws (33)
Replace.
If necessary.
ah. Flanges
Replace.
If necessary.
(34)
ai. Gasket (35)
Replace.
If necessary.
aj. Copper
Replace.
If necessary.
tubing 2
inch ID (36)
Change 1
4-1308.4


 


Privacy Statement - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business