TM 55-1905-219-14-9
4-73. CONNING TOWER AND AIRPORTS - MAINTENANCE INSTRUCTIONS.
This task covers:
a.
Inspection
b.
Replace/Repair
INITIAL SETUP:
Test Equipment
References
NONE
NONE
Equipment
Special Tools
Condition Condition Description
NONE
NONE
Material/Parts
Special Environmental Conditions
NONE
NONE
Personnel Required
General Safety Instructions
1
NONE
LOCATION
ITEM
ACTION
REMARKS
INSPECTION
1. Conning
a. Windows
1. Inspect for breaks
Tower
and cracks.
2. Inspect for severe
scratching.
b. Hinged window
Inspect for bends and
adjusters
damage.
c.
Hardware
1. Inspect for missing
or damaged compo-
nents.
2. Insure all hardware
is tight.
2. Airports
a. Hardware
Inspect for missing or
damaged parts.
b. Screens
Inspect for damage.
Change 1 4-1445