Custom Search
 
  
 
TM 55-1905-220-14-10
5-5. MARINE GEAR MAINTENANCE INSTRUCTIONS (Continued).
LOCATION
ITEM
ACTION
REMARKS
OVERHAUL IN CRAFT (Cont)
retainer shims (123) that were removed,
against the main housing and secure the
retainer to the housing with seven 1/2-13
X 1-1/2 hex-head cap screws (121).
Tighten the cap screws to 85 lb-ft (115.2
Nm) torque.
2. Carefully tap the propeller flange on the
counter shaft. Do not damage the oil
seals! Install a new ring gasket (119) in
the propeller flange. Secure the propeller
flange to the counter shaft (120) with the
propeller flange shim (118), the retainer
washer, and three 5/8-18 X 1-1/2 hex-
head cap screws (116). Tighten the cap
screws to 175 lb-ft (237.3 Nm) torque.
3. Slide the propeller shaft and companion
flange  forward  against  the  propeller
flange. Align the scribed marks on the
propeller flange and companion flange.
Secure the flanges together with the bolts
previously removed.
4. After the installation has been completed,
fill the marine gear sump with oil.
5-163


 


Privacy Statement - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business