Tweet |
![]()
Custom Search
|
|
![]() |
||
![]() TM 55-1905-220-14-10
5-7. VARIABLE SPEED MECHANICAL GOVERNER-MAINTENANCE INSTRUCTIONS (Continued).
LOCATION
ITEM
ACTION
REMARKS
OVERHAUL-DISASSEMBLY (Cont)
o. Needle
1. Support the control
link operating lever
(88)
on a sleeve.
2. Rest the sleeve on
the bed of an arbor
press.
3. Press both bearings
out of the lever.
p. Buffer
Remove.
If necessary.
screw (89)
and lock
nut (90)
q. Dowel pins
Remove.
If necessary.
(91) and
pins (92,
93, 94
and 95)
5-192
|
||
![]() |