Custom Search
 
  
 
TM 55-1905-220-14-10
5-21. HYDROSTARTER - MAINTENANCE INSTRUCTIONS (Continued).
LOCATION
ITEM
ACTION
REMARKS
ASSEMBLY (Cont)
k. Screws (8),
1. Install.
There should be
and lock-
a slight pre-
washers
2. Tighten screws to
compression of
(9)
300 inch lbs.
the barrel (11)
(33.9 Nm) torque.
and the port
plate (6). If
not, replace
spring (14).
5-389


 


Privacy Statement - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business