Custom Search
 
  
 
TM 55-1905-220-14-10
5-33. ENGINE ASSEMBLY-REMOVAL AND RUN-IN-MAINTENANCE INSTRUCTIONS.
LOCATION
ITEM
ACTION
REMARKS
ENGINE RUN-IN INSTRUCTIONS (Cont)I
(b)
In some cases, gages reading in pounds per square inch are
used for determining pressures while standard characteristics
are given in inches of mercury or inches of water. It is extremely
important that the scale of such a gage be of low range and
finely divided if accuracy is desired. This is especially true of a
gage reading in psi, the reading of which is to be converted to
inches of water. The following conversion factors may be
helpful.
Inches of water = psi x 27.7 inches
Inches of mercury = psi x 2.04 inches
(4) Run-In Procedure
The procedure outlined below will follow the order of the sample Engine Test Report on
(a)
Pre-Starting
1. Fill the lubrication system.
2. Prime the fuel system.
3. A preliminary valve clearance adjustment must be made before
the engine is started.
4. A preliminary injector timing check must be made before starting
the engine.
5. Preliminary governor adjustments must be made.
6. Preliminary injector rack adjustment must be made.
5-532


 


Privacy Statement - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business