Custom Search
 
  
 
TM 55-1905-220-14-10
5-35. BLOWER - MAINTENANCE INSTRUCTIONS (Continued).
LOCATION
ITEM
ACTION
REMARKS
OVERHAUL - TIMING BLOWER ROTORS (Cont)
NOTE
If the proper clearances cannot be obtained between the rotors, a mix of the
former and current rotors, which have a different helix angle, may have occurred.
g. After determining the amount one rotor must be re-
volved to obtain the proper clearance, add shims
back of the proper gear as shown below to pro-
duce the desired result. When more or less shims
are required, both gears must be removed from
the rotors. Placing a .003 inch shim in back of
a rotor gear will revolve the rotor .001 inch.
h. Install the required thickness of shims in back of
the proper gear and next to the bearing inner race
and reinstall both gears. Recheck the clearances
between the rotor lobes.
i.
Determine the minimum clearances at points "A"
and "B". Insert the feeler gages, between the end
plates and the ends of the rotors. This operation
must be performed at the ends of each lobe, making
12 measurements in all. See below for the mini-
mum clearances.
5-590


 


Privacy Statement - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business