Tweet |
Custom Search
|
|
|
||
TM 55-1905-220-14-11
5-112. RUDDER ANGLE TRANSMITTER - MAINTENANCE INSTRUCTIONS
(Continued).
LOCATION
ITEM
ACTION
REMARKS
OVERHAUL (Cont)
e. Spring pin
Install.
(19)
f. Setscrew
Tighten.
(20)
g. Rudder
Position to amidships.
h. Ohmmeter
1. Connect to ter-
Observe reading.
minal strip (37),
Readings should
terminals 14 (P1),
be equal (within
and 15 (P2).
25 ohms).
2. Connect to ter-
minals 15 (P2),
and 16 (P3), and
compare readings.
i.
Setscrew
Loosen setscrew and
If necessary
(18), and
rotate potentiometer.
to obtain an
potenti-
equal reading
ometer
on ohmmeter.
(21)
j.
Setscrew
Tighten.
(18)
k.
Ohmmeter
Remove.
5-1265
|
||