Custom Search
 
  
 
TM 55-1905-220-14-11
6-1.
PROPELLER SHAFT AND BEARINGS - MAINTENANCE INSTRUCTIONS
(Continued).
LOCATION
ITEM
ACTION
REMARKS
REMOVAL (Cont)
3. Propeller
a.
Propeller
Remove by pulling from
Propeller weighs
and Stub
(18),
strut.
400+lbs (181.4
Shaft
and
kg) and the stub
(under
stub
shaft 215 lbs
craft)
shaft
(97.5 kg)
(16)
b. Screws
Remove.
(19),
seal
ring
(20),
and
seal
(21)
c.
Jacking
1. Install screws in
Screws are 3/4-
screws
tapped holes of
16 NF thread.
and
flange.
flange
of stub
2. Tighten evenly.
shaft
(16)
3.
Remove propeller.
d. Seal
Remove.
(22)
4. Bearing
a. Lockwire
Remove.
Strut
(23)
b.
Nuts (24)
Remove.
c.
Jacking
1. Install jack screws
screws,
into tapped holes of
and
flange.
flange
of
2. Remove bearing strut.
bearing
strut
(25)
6-10


 


Privacy Statement - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business