Custom Search
 
  
 
TM 55-1905-220-14-11
6-1.
PROPELLER SHAFT AND BEARINGS - MAINTENANCE INSTRUCTIONS
(Continued).
LOCATION
ITEM
ACTION
REMARKS
REMOVAL (Cont)
a. Shaft
1. Remove lockwire (28),
Tube
seal
and bolts (29).
Shaft
(27)
2. Slack off glands (30).
b. Cotter
Remove.
pins
(31),
nuts
(32),
and
bolts
(33)
c.
Tube shaft
Force aft approximately
(34)
6 inches (15 cm).
d. Cotter
Remove.
pin
(35),
and
nut
(36)
6-12


 


Privacy Statement - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business