Custom Search
 
  
 
TM 55-1905-220-14-11
6-1.
PROPELLER SHAFT AND BEARINGS - MAINTENANCE INSTRUCTIONS
(Continued).
LOCATION
ITEM
ACTION
REMARKS
INSTALLATION (Cont)
e. Bolts (33),
Install.
nuts (32),
and cotter
pins (31)
f.
Shaft seal
Install glands (30),
(27)
bolts (29), and lock-
wire (28).
6-17


 


Privacy Statement - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business