Custom Search
 
  
 
TM 55-1905-220-14-12
SECTION II. MAINTENANCE ALLOCATION CHART (CONTINUED)
(1)
(2)
(3)
(4)
(5)
(6)
MAINTENANCE LEVEL
GROUP
COMPONENT/
MAINTENANCE
UNIT
DS  GS DEPOT
TOOLS AND
NUMBER
ASSEMBLY
FUNCTION
C
O
F
H
D
EQUIPMENT
REMARKS
1450
Cylinder Assembly, 1301,
Inspect
0.3
60 Pound
Test
1.0
Service
1.0
Replace
4.0
1460
Halon System Piping and
Inspect
1.0
Wiring
Test
2.0
Repair
6.0
1500
Inspect
1.0
System
Service
2.0
Test
1.0
Replace
15.0
Repair
5.0
20.0
Overhaul
*
L
1510
Alarm Panel
Inspect
0.5
Test
1.0
Replace
30.0
Repair
5.0
20.0
1600
Electronic(Navigation
Inspect
1.0
Systems
Test
1.5
Replace
25.0
Repair
2.0
12.0
Overhaul
*
L
1610
Inspect
1.0
Replace
10.0
Repair
13.5
1700
Oil/Water Separation
Inspect
0.5
System
Service
1.5
Replace
20.0
Repair
2.0
13.5
Overhaul
*
L
1800
Piping Systems
Overhaul
*
L
Change 5 B-36


 


Privacy Statement - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business