TM 55-1905-220-14-4
3-54. LINE SHAFTING (PORT SIDE ONLY) - MAINTENANCE INSTRUCTIONS (Continued).
LOCATION
ITEM
ACTION
REMARKS
DISASSEMBLY (Cont)
8. Aft eng-
a. Pro-
1. Lift and slide the
Use chain
ine room,
peller
propeller line shaft
hoists. The
port side
line
(34) out of bulkhead.
shaft weighs
shaft
388 lbs
2. Slide gland stuffing
(176 kg).
box (29) off the shaft.
3. Remove propeller line
shaft (34).
b. Gland
Remove preformed pack-
stuf-
ing (39) from gland
fing box
stuffing box (29).
3-971
|
||