TM 55-1905-220-14-5
3-113.8. SIGNAL LIGHT-MAN-OVERBOARD-MAINTENANCE INSTRUCTIONS.
This task covers:
a. Inspection
b.
Removal/Repair
c.
Replacement
INITIAL SETUP
Test Equipment
References
NONE
NONE
Equipment
Special Tools
Condition Condition Description
Para
NONE
NONE
Material/Parts
Special Environmental Conditions
NONE
NONE
Personnel Required
General Safety Instructions
1
Observe WARNING in this procedure.
LOCATION
ITEM
ACTION
REMARKS
INSPECTION
1.
Mast
Signal
a. Burned out lamp.
light
(Manover-
b. Broken globe or lamp.
board)
c. Broken, bent or dam-
aged metal.
d. Loose nuts or screws.
e. Frayed wiring.
f. Leaking bushings.
3-1949