Custom Search
 
  
 
TM 55-1905-220-14-6
3-118.
TORQUE COUPLING - MAINTENANCE INSTRUCTIONS.(Continued)
LOCATION
ITEM
ACTION
REMARKS
INSTALLATION (Cont)
Do not apply flame directly to the grid groove area.
Do not heat hubs over 275 (1350C).
F
11.
Hub (type
1. Install studs (28) and
FT) (13)
jam hex nuts (27).
2. Install driving pins
(25) and nuts (26).
3. Install bearings (24
Bearing and
and 23).
sleeve clear-
ance min. .005
inches (.013
4. Install sleeve (23).
cm) max. .008
inches (.020
cm).
5. Install torque cover
half (8).
6. Install grooved ring
(21).
7. Install driving plate
Engage driving
(20).
pins (25).
8. Install loading
regulating springs
(19) and cap washers
(18).
9. Install ring spring
guide (17).
10. Install self-locking
Tighten lock-
nuts (16).
nuts until
springs are
slightly com-
pressed.
3-2002


 


Privacy Statement - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business