Custom Search
 
  
 
TM 55-1905-220-14-6
3-141.2.
ENGINE THROTTLE LINKAGE-MAINTENANCE INSTRUCTIONS
(Continued).
LOCATION
ITEM
ACTION
REMARKS
INSTALLATION - CONTROL UNIT
5.
Control
Control
Install.
Refer to para-
unit
unit
graph 3-158.
6.
Articu-
a. Ball
Place in control lever
lator
joint
(9).
assembly
(8)
(5)
b. Lock-
Install.
washer
(7),
and
nut
(6)
7.
Connecting
a. Ball
Place in engine control
rod
joint
lever (4).
assembly
(3)
(1)
b. Nut (2)
Install.
8.
Control
a. Nut
Remove.
Cable
(6),
and
lock-
washer
(7)
b. Articu-
Remove from cable clamp.
lator
(5)
c.
Nut
Loosen.
(10)
d. Ball
Remove.
joint
(8)
3-2370


 


Privacy Statement - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business