Custom Search
 
  
 
TM 55-1905-220-14-7
3-222.
INTERMEDIATE STORAGE (Cont).
f.
Disconnect fuel line. Place in container containing 10 minutes running time of rust preventive fuel
oil.
g.
Operate engine for five minutes.
h.
Loosen tension on belt drive to bilge pump.
C.
Marine Gear.
Operate engine at 600 RPM for 10 minutes. Engage clutches alternately to circulate oil through all
moving parts.
D.
Torque Converter.
1.
Operate engine until temperature reaches 150 (66 ).
F
C
a.
Remove oil from the converter.
b.
Remove the filter.
CAUTION
Due to lack of lubrication, do not exceed 20 second limit.
c.
Start the engine and stall the converter for twenty seconds at 1000 RPM to scavenge oil from
converter.
d.
Replace filter and new element.
2.
Fill converter with preservative oil (MIL-L-2126 0, Grade 1).
CAUTION
Do not stall converter for longer than 30 seconds.
3.
Start engine and operate converter for at least 10 minutes at a maximum of 1000 RPM. Engage clutch
on an arbor winch and stall the converter to raise the oil temperature to 225 (107 ).
F
C
4.
Stop the engine.
E.
Hydrostarters
Apply a non-friction rust preventive compound to all exposed parts.
3-3356


 


Privacy Statement - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business