TM 55-1905-220-14-8
4-10.4. LUBE OIL PUMP CONTROLLER - MAINTENANCE INSTRUCTIONS (Continued).
LOCATION
ITEM
ACTION
REMARKS
REMOVAL
3.
Controller
a. Captive
Rotate counter-clockwise
screws
to loosen.
(1)
b. Door (2)
Swing open.
c.
Wiring
Tag and disconnect from
Refer to
terminal block (4).
schematic.
d. Control-
Remove from bulkhead.
ler (3)
REPAIR
4.
Pushbutton
a. Wiring
Tag and disconnect.
switches
b. Retain-
Unscrew and remove.
ing nut
(5)
c.
Identi-
Remove.
fication
plate
(6), and
switch
(7)
d. Switch
Install.
(7),
identi-
fication
plate
(6), and
retain-
ing nut
(5)
e. Wiring
Reconnect.
5.
Fuses
Fuses (8)
Remove and replace.
4-520
|
|