TM 55-1905-220-14-8
4-18.1. SEWAGE SYSTEM VACUUM PUMP - MAINTENANCE INSTRUCTIONS (Continued).
LOCATION
ITEM
ACTION
REMARKS
REPAIR (Cont)
k.
Fan guard
Install.
(49), and
screws (48)
l.
Dead end
Install.
cooling
fan (47),
and retain-
ing ring (46)
m. Fan guard
Install.
(45), and
screws (44)
n.
Coupling
Install.
(40), and
keys (41)
o.
Vacuum pump
Align with holes in base.
(42), and
mounting
liner (43)
p.
Screws (38),
Remove.
and nuts
(37)
q.
Setscrews
Tighten.
(39)
r.
Hoses
Reconnect.
4-680
|
|