TM 55-1905-220-14-8
4-19.2. SEWAGE DISCHARGE PUMP MOTOR - MAINTENANCE INSTRUCTIONS.
This task covers:
a. Inspection
c. Removal
b. Service
d. Installation
INITIAL SETUP
Test Equipment
References
NONE
NONE
Equipment
Special Tools
Condition Condition Description
NONE
NONE
Material/Parts
Special Environmental Conditions
Grease, ball and roller
NONE
bearing (MIL-G-18709)
Personnel Required
General Safety Instructions
2
Observe WARNINGS in this
procedure.
LOCATION
ITEM
ACTION
REMARKS
To prevent accidental shock and possible injury
tag and place circuit breaker in the OFF position.
INSPECTION
1.
Motor
a. Casing
Inspect for leaks,
cracks, or dents.
b. Shaft
Inspect for breaks,
cracks, nicks or burrs.
c.
Hardware
Inspect for tightness.
4-706