Custom Search
 
  
 
TM 55-1905-220-14-9
4-63. EXFHAUST PIPING INSULATION - MAINTENANCE INSTRUCTIONS (Continued)
This task covers:
a. Inspection
b. Replace
c. Repair
INITIAL SETUP
Test Equipment
References
NONE
TM 55-2090-201-14&P
Equipment
Special Tools
Condition Condition Description
NONE
NONE
Material/Parts
Special Environmental Conditions
NONE
Do not drain oil into bilges.
Collect oil and dispose of pro-
perly.
Personnel Required
General Safety Instructions
1
NONE
NOTE
Secure the Oil/Water Separator prior to working on the system.
INSPECTION
1. Piping
a. Tank
Inspect for leaks.
Refer to Direct
Support Mainte-
nance.
b. Oil/Water
Inspect.
Refer to TM 55-
Separator
2090-201-14&P.
c.
Water gage
Inspect for breaks,
cracks, and leaks.
d. Piping
Inspect for breaks,
Refer to Direct
cracks, bends and
Support Mainte-
leak.
nance.
e. Flange
Inspect for leaking
gasket.
4-1365


 


Privacy Statement - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business