TM 55-1905-221-14-1
(3) Close the ramp hoist hydraulic system suction valve at tank in engine room.
(4) Close the hydraulic starting system suction valve at tank in engine room.
(5) Disconnect ground cable from battery (in Engine Room).
(6) Close the valves at both accumulators.
(7) Close the hatches.
(8) Disconnect electrical connectors and remove fore mast, main mast and stern mast and store them in a
lazarette.
4-8. REINSTALLATION AFTER MOVEMENT.
a. Use a wire rope sling to lower the landing craft into the water.
b. Perform the procedures listed below before operating the landing craft after reinstallation.
(1) Remove the stern mast, main mast and fore mast from the lazarette and install.
(2) Connect all electrical connections.
(3) Open the hatches.
(4) Open the valves on both accumulators.
(5) Connect ground cable to battery.
(6) Open the hydraulic starting system suction valve at the tank in engine room.
(7) Open the ramp hoist hydraulic system suction valve at the tank in the engine room.
(8) Open the hydraulic steering suction valve at the tank in the engine room.
(9) Open the fuel supply and return valves in the engine room for both uel tanks.
f
c. Follow procedures described in paragraph 4-5 before operating the landing craft.
4-4


 