TM 55-1905-221-14-1
4-32.
HYDRAULIC STARTING SYSTEM PIPING.
This task covers:
a. Inspection
b. Service
INITIAL SETUP
Equipment
Condition
Paragraph
Condition Description
Test Equipment
NONE
NONE
Tools and Special Tools
Special Environmental Conditions
General Mechanic Tool Kit
NONE
Material/Parts
General Safety Instructions
Detergent
NONE
Personnel Required
Troubleshooting Reference
Operator-Crew
NONE
(MOS 61B & C)
References
Approximate Time Required (minutes)
NONE
Inspection
90
Service
90
Location/Item
Action
Remarks
INSPECTION
1. Piping
a. Check for leaks around hand
valves (1) and accumulators
(2).
4-116