TM 55-1905-221-14-1
4-63. BILGE PIPING.
This task covers:
a. Inspection
b. Replacement
INITIAL SETUP
Equipment
Condition
Condition Description
Engine not operating
Test Equipment
Special Environmental Conditions
NONE
NONE
Tools and Special Tools
General Safety Instructions
General Mechanics Tool Kit
NONE
Material/Parts
Troubleshooting References
Detergent
NONE
Personnel Required
Approximate Time Required (minutes)
Operator-Crew
Service
30
(MOS 61B & C)
Replace
90
References
Location/Item
Action
Remarks
SERVICE
1. Bilge
a. Use detergent and water solu-
Piping
tion to clean all hoses,
piping, tubing, and valves in
the bilge piping system.
b. Make sure that all clamps are
secure.
4-257