Custom Search
 
  
 
TM 55-1905-221-14-1
4-64. BILGE PUMP.
The landing craft is equipped with three bilge pumps. Two pumps are mounted on the inboard engine of the port
propulsion unit, and one pump is mounted on the inboard of the starboard propulsion unit.
NOTE
This paragraph includes the disassembled views of the different configurations of bilge pumps which may
be installed in the landing craft.
This task covers:
a.
Inspection
c.
Replacement
b.
Servicing
d.
Repairing
INITIAL SETUP
Equipment
Condition
Condition Description
Engine not operating
Test Equipment
Special Environmental Conditions
NONE
NONE
Tools and Special Tools
General Safety Instructions
General Mechanics Tool Kit
NONE
Material/Parts
Troubleshooting References
NONE
NONE
Personnel Required
Approximate Time Required (minutes)
Operator-Crew
Inspect
18
(MOS 61B & C)
Service
30
Replace
150
References
Repair
270
NONE
4-264


 


Privacy Statement - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business